This guide is general planning information. The exact authority route, specification, programme and price depend on the property and must be confirmed for the real project.
Existing condition and handover status
A shell-and-core unit, a fitted office and an occupied refurbishment require very different demolition, preparation, service and protection work.
Layout, partitions and acoustic requirements
Cabin quantity, glass type, gypsum build-up, doors, height and privacy or acoustic expectations all affect materials and labour.
MEP and technology scope
Lighting, power, data, HVAC coordination, plumbing, washrooms and equipment connections can represent a major part of the technical scope.
Finishes and custom furniture
Flooring, ceilings, wall finishes, reception joinery, executive furniture and workstation quantity determine both material and manufacturing requirements.
Building access, approvals and programme
Restricted working hours, lift booking, protection, permits, NOCs and accelerated completion dates influence sequencing and resource planning.